It’s been a very busy July and August.
I fitted a new en-suite shower room after stripping out the old shower toilet and basin, tiled floor to ceiling and then re-installed.
Have completed a few commercial jobs, I drilled 140 anchor bolts into a concrete floor to secure racking in a warehouse.
various plumbing jobs, leaking taps, faulty toilet cisterns, dripping overflows, changed radiator valves, plumbed in a washing machine and dishwasher. Fitted an outside tap and all the plumbing in the shower room above. I have also re-siliconed a couple of bathrooms where the old silicone is no longer preventing leaks.
The last 2 weeks, I have been decorating and renovating some offices in Hungerford, High street.
In between times I have done various other small jobs, these hanging planters were nice.
Over the next few weeks, I have a bungalow to redecorate and tidy up and I’m then going to be replacing all the woodwork on a local ladies garage.
Busy, busy.