Installed a new bathroom suite into a bathroom, moving the bath 90 degrees to allow the installation of a corner shower. This required a false wall to be inserted to form the back of the shower cubicle. We then tiled the bathroom and installed blind's, mirrors etc. [caption id="attachment_2663" align="alignnone" width="604"] empty bathroom[/caption]
Read more
Sports Hall light bulb change and ball removal!
Spent the morning today in a scissor lift changing the light bulbs in a school sports hall. Amazing how much difference in terms of brightness new bulbs make. I also removed all of the balls that were stuck in the roof supports.
Read more
Last few weeks.
It's been a very busy July and August. I fitted a new en-suite shower room after stripping out the old shower toilet and basin, tiled floor to ceiling and then re-installed. Have completed a few commercial jobs, I drilled 140 anchor bolts into a concrete floor to secure racking in a warehouse. various plumbing jobs,…
Read more
Gas Safe access panels installed.
New laws regarding houses that are let to tennants, have come into force. These now include a requirement for the full length of an outlet flue to be accessible. That meant that three access panels were needed on this flue.
Read more